Production Records on the Horizon
2025 will be a historic year for Latin American copper. After years of stagnant production, investments are finally paying off.
The Investment Pipeline
Nearly $104B USD will be invested in copper projects starting production before 2030, adding 3.2 Mt/year to the region's current 7.6 Mt/year.
Codelco, the world's largest copper producer, targets 1.4Mt of own production. The joint venture with Anglo American will add significant capacity to the portfolio.
The Maintenance Challenge
More production means more equipment wear. Scheduled and unscheduled maintenance shutdowns will be more frequent and more critical. During these periods, filtration capacity becomes the bottleneck.
- SX plants require organic treatment during shutdowns
- EW cells need cleaning and crud removal
- Clarification systems must remain operational
- Crud filtration cannot stop
Mobile Solutions for Maintenance
Mobile filtration allows maintaining operations during fixed equipment shutdowns. A backup system can be deployed in 24-48 hours, avoiding production losses that can exceed $100,000 USD per day of unplanned downtime.
Conclusion
The copper boom is a historic opportunity for Latin America. But seizing it requires reliable and resilient operations. Companies that invest in backup capacity and flexible solutions will be the ones capturing the full value of this bull cycle.
Sources
Need to optimize your operation?
Our technical team can evaluate your current process and propose solutions tailored to your specific needs.
Contact Technical Team