Success Story - High Altitude

Zero Safety Incidents

EW Cell Crud Removal at High-Altitude Copper Plant

0
Safety Incidents
100%
Crud Removal
4,200+
Meters Altitude
1 cell
Per Day (Target Met)

Operation

Copper SX/EW Plant

Location

Atacama Region, +4,200 masl

Service

Comprehensive EW cell crud removal

Management System

SG-SSSC (Safety, Health, Sustainability)

The Challenge

EW cell cleaning under extreme high-altitude conditions

Operational Problem

The accumulation of metallic and organic crud at the bottom of cells during electrolytic operation creates multiple problems affecting EW process efficiency and safety.

Short Circuits

Metallic deposits cause electrical failures and safety risks

High Power Consumption

Accumulated crud increases resistance and energy costs

Cathode Quality

Contamination reduces copper purity

Extreme Conditions

+4,200 masl
Operating altitude

Hypobaric conditions requiring special protocols and trained personnel

Critical Risks
  • Electrical risk in energized cells
  • Exposure to acid mist
  • Mechanical entrapment risk
  • Confined space work
SG-SSSC System

Strict compliance with MLCC's Safety, Health, Sustainability and Communities Management System

The Tec-Ionic Solution

Comprehensive crud removal methodology with the highest safety standards

1

Safety Analysis

JSA and electrical/structural parameter review for each cell

2

Electrode Removal

Controlled removal of 3 cathodes and 3 anodes to enable access

3

Vacuuming and Cleaning

Pneumatic crud suction and controlled-pressure hydraulic cleaning

4

Verification and Reinstallation

Leveling, electrode reinstallation and photographic record

Specialized Equipment

High-capacity industrial vacuum with pneumatic pumps
Anti-static hose lines (2-3 inches)
Mobile filter presses for solid-liquid separation
Settling tanks
Three-phase control panels
Container-warehouses with logistical autonomy

All equipment certified and designed for high-altitude operations

Safety Management

Certified PPE

  • P100 filter respirators
  • Waterproof suits
  • Dielectric footwear

Procedures

  • Lockout/Tagout (LOTO)
  • Gas verification and ventilation
  • Special permits (hot work, confined spaces)

Training

  • HYPOBARIA (geographic altitude work)
  • PREXOR (noise exposure)
  • PLANESI (silica exposure)
7x7
Day shift (08:00-20:00h)
1 cell/day
Contractual output
APR 3+ years
Mining experience
ISOTools
Traceability and tracking

Verifiable Results

Measurable impact on safety, quality and operational continuity

Safety

0
Incidents throughout the contract
  • "Life-Saving Rules" compliance
  • 100% deadlines met
  • Law 20.393 adherence

Quality

100%
Metallic deposit removal
  • Electrical conductivity restored
  • Cathodes within LME standard
  • Georeferenced photographic record

Operations

No Stoppages
Productive continuity maintained
  • Reduced energy consumption
  • Lower short-circuit risk
  • Successful staged planning

Tec-Ionic's operating model proved to be an efficient, quick-to-implement, low-impact alternative for operations under extreme high-altitude conditions.

Measurable and replicable results across other sector operations

Environmental Management

Waste Control

Metallic waste and contaminated water stored in sealed containers

DS-43 Regulation

Disposal in accordance with current MINSAL regulations

PR-SUST Compliance

PR-SUST-009 and PR-SUST-010 compliance for hazardous substances

Need Crud Removal Services for Your EW Plant?

Our specialized team operates under extreme conditions with the highest safety standards. We guarantee measurable results and zero incidents.